Deprecated: strpos(): Passing null to parameter #1 ($haystack) of type string is deprecated in /www/data/home2/proffx/public_html/wp-includes/functions.php on line 7300

Deprecated: str_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /www/data/home2/proffx/public_html/wp-includes/functions.php on line 2189

Deprecated: Creation of dynamic property WC_Gateway_PPEC_Plugin::$gateway_loader is deprecated in /www/data/home2/proffx/public_html/pub/plugins/woocommerce-gateway-paypal-express-checkout/includes/class-wc-gateway-ppec-plugin.php on line 371

Deprecated: Creation of dynamic property WC_Gateway_PPEC_Plugin::$admin is deprecated in /www/data/home2/proffx/public_html/pub/plugins/woocommerce-gateway-paypal-express-checkout/includes/class-wc-gateway-ppec-plugin.php on line 372

Deprecated: Creation of dynamic property WC_Gateway_PPEC_Plugin::$checkout is deprecated in /www/data/home2/proffx/public_html/pub/plugins/woocommerce-gateway-paypal-express-checkout/includes/class-wc-gateway-ppec-plugin.php on line 373

Deprecated: Creation of dynamic property WC_Gateway_PPEC_Plugin::$cart is deprecated in /www/data/home2/proffx/public_html/pub/plugins/woocommerce-gateway-paypal-express-checkout/includes/class-wc-gateway-ppec-plugin.php on line 374

Deprecated: Creation of dynamic property WC_Gateway_PPEC_Plugin::$ips is deprecated in /www/data/home2/proffx/public_html/pub/plugins/woocommerce-gateway-paypal-express-checkout/includes/class-wc-gateway-ppec-plugin.php on line 375

Deprecated: Creation of dynamic property WC_Gateway_PPEC_Plugin::$client is deprecated in /www/data/home2/proffx/public_html/pub/plugins/woocommerce-gateway-paypal-express-checkout/includes/class-wc-gateway-ppec-plugin.php on line 376

Deprecated: Creation of dynamic property myCRED_Network_Module::$network_enabled is deprecated in /www/data/home2/proffx/public_html/pub/plugins/mycred/modules/mycred-module-network.php on line 77
Traffic shift on US 50 scheduled through late spring – Cincy Link
News

Traffic shift on US 50 scheduled through late spring


The Ohio Department of Transportation announced a scheduled traffic shift in eastern Hamilton County as part of an ongoing bridge rehabilitation project beginning next week. According to officials, the westbound U.S. 50 contraflow lane will be removed on Monday, Jan. 30 and a contraflow lane will be implemented in the eastbound direction between the Beechmont Avenue ramp and the Red Bank exit. Once the contraflow lane is in place crews will demolish the eastbound structure. Officials say this traffic pattern will remain in place through the late spring. The rehabilitation project will cover the two bridges located on Columbia Parkway over Heekin Avenue and the westbound ramp to Eastern Avenue. The project will involve full deck replacements and substructure repairs, among other things. For live traffic updates, click here.

The Ohio Department of Transportation announced a scheduled traffic shift in eastern Hamilton County as part of an ongoing bridge rehabilitation project beginning next week.

According to officials, the westbound U.S. 50 contraflow lane will be removed on Monday, Jan. 30 and a contraflow lane will be implemented in the eastbound direction between the Beechmont Avenue ramp and the Red Bank exit.

Once the contraflow lane is in place crews will demolish the eastbound structure.

Officials say this traffic pattern will remain in place through the late spring.

The rehabilitation project will cover the two bridges located on Columbia Parkway over Heekin Avenue and the westbound ramp to Eastern Avenue.

The project will involve full deck replacements and substructure repairs, among other things.

For live traffic updates, click here.


Source link

Show More

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /www/data/home2/proffx/public_html/wp-includes/functions.php on line 5427